ICNC  serves in  21 aimags,  227 soums and settled areas.  

NETWORK RELIABILITY


RING NETWORK 1 - BAYAN-ULGII -  UVS - ZAWKHAN -  GOBI-ALTAI -  KHOWD
RING NETWORK 2 - KHUWSGUL -  ZAWHAN -  GOBI-ALTAI -  BAYANKHONGOR -  UVURKHANGAI - BULGAN
RING NETWORK 3 - KHENTII -  SUKHBAATAR -  DORNOGOBI -  UMNUGOBI -  DUNDGOBI -  UVURKHANGAI -  BULGAN -  TUV -  ULAANBAATAR -  NALAIKH -  BAGANUUR
RING NETWORK 4 - TUV -  BULGAN -  ORKHON -  DARKHAN-UUL -  TUV -  ULAANBAATAR
RING NETWORK 5 - KHENTII -  SUKHBAATAR -  DORNOD

Programs and projects

2007- “FOC network in soums

The project connected 33 soums of 18 aimags through FOCs and there were rolled out 1556 km long FOC network and installed STM-1 transmission links with a speed capacity of 155 Mbps. Operation of the network allows provisioning of mobile and internet services, broadcasting and other ICT services to individuals, public and private businesses in soums.

 

2008- continuation of “FOC networks in soums”

The project connected 28 soums of 15 aimags, there was established 860 km long FOC cable and was installed STM-1 transmission facilities. The network provides technical availabilities of mobile and internet services, broadcasting and other ICT services to individuals, public and private businesses in those soums.

 

2009 – “Establishment of back-up networks of the backbone network

In a total, there was established a 1800 km long FOC network and installed STM-4 transmission facility with a speed capacity of 2,5 Gbps in 15 soums of 7 aimags in order to set up a ring network to increase a capacity and reliability of the backbone network. As a result of the project, the reliability was enhanced by 2 times by establishing a ring structure of the network connecting Ulaanbaatar – Undurkhaan-Baruun-Urt-Sainshand-Dalanzadgad- Bayangol-Dashinchilen-Ulaanbaatar. The capacity of the backbone network was increased by 4 times in the central ring network.

 

2011 – Supply and installation of DWDM network facilities

The project aimed to establish an internet international gateway by installing the high-speed broadband DWDM equipment  with iCNC’s own investment. Installation of the high-speed DWDM with a capacity of 10 GBps through the FOC connected between Ulaanbaatar and Zamiin Uud created technical capability to import internet wholesale traffic.

 

2011-2013 – “ Renovation and expansion of the information and communications backbone network

The project connected 150 soums of 19 aimags through FOCs network with a soft loan investment of the Government of China. Implementation of the project rolled out 9 000 km long FOC network connecting soums to provide telecommunications services. In 2012, 30 soums of 4 aimags were connected with FOCs. Ground installation works have been completed and acceptance for operation is undergoing. 